Maintenance of MEG system

Checks to be made

Helium level

  • Every two days, check the helium level: it should be higher than 50%

  • Check the gas flow and pressure of the ATP and the ATL

  • If the helium pressure is low (Low G FLOW on the ATL):

    • Remove the hose between the ATP and the ATL

    • Check whether helium is passing through the hose

    • Plug the hose in again and see whether G Flow increases

    • Restart the ATL using the green button on the rear panel

Air pressure

Check the air pressure every month.

  • The air pressure must be around 0.7 to 0.8; if it is not, this could indicate a compressor problem

  • When the air pressure is low, the MSR door can get stuck

Compressor working hours

The working hours of the ATL and ATP compressors are shown on the small display of each compressor. This is the number of hours the compressor has been in operation.

MSR door

  • Test the emergency button every week

  • Check whether releasing the pressure with the emergency button is getting harder, or whether the pressure is not released as it should be

  • If you use the manual handle, put the handle back in its original position afterwards; otherwise the door will not reset

Data retrieval from ATP and ATL for diagnostic

When the ATP and ATL helium recovery system exhibits a low gas flow or an unusual temperature or pressure, contact the people listed in the contacts table below and provide them with the diagnostic data of both devices.

The detailed retrieval steps, including IP addresses and credentials, are kept in the internal version of this page.

  1. Connect to the NYU Abu Dhabi VPN

  2. Retrieve the data from the ATP and the ATL by opening an FTP connection to 10.224.44.200 and 10.224.44.201

  3. Use the following information username: qd, password: 79653

  4. Navigate to the /StorageCard/DAT_Files/ directory on each of the two IP addresses and send the latest .dat files

Note

The procedure is documented here: QD Documentation for Data retrieval

Note

Sheet to be filled in by the maintenance team with the helium levels: Helium Filling Sheet

Helium refill process

  • Bijoy (bs4233@nyu.edu) indicates that helium tanks are needed and communicates this need to Neelima Dinil (nd1508@nyu.edu)

  • Hadi receives an email asking him to approve the request for helium tanks

  • Hadi confirms the request by replying, with Osama, Bijoy, Neelima and Nyavili Miyanda (vili.mulemba@nyu.edu) in copy

  • Neelima schedules the delivery of the tanks with Bijoy

  • Bijoy schedules the helium refill as necessary

  • When a new PO is needed to cover the dewar costs, issue one using the CTP Requisition form, then inform Jinna

The ATL tank (QD recovery system) is used to refill the dewar. However, when the tanks inside the ATL room are full, some helium needs to be evacuated into the lab so that the ATL tank starts to fill again when it is placed back into the recovery system.

ATL compressor Helium filling sheet

System

Refill date

Helium level Before

Helium level after

Nominal range

ATL Compressor

x/y/z

0

0

0

Request for new equipment/IT or Helium Dewar

CTP members can raise requests to purchase new equipment, lab supplies and so on.

Note

CTP member request for equipment or a helium dewar: CTP Requisition Form

Helium refill: schedule and monitoring

  • A refill is needed when the helium level meter behind the dewar indicates a level below 20%. The level should not go below 20%: when it starts approaching 20%, a refill is needed

  • Bijoy comes to check the measurement physically, on the display

  • Every Monday, Bijoy and his team perform the helium refill

    • The team comes at 9 am UAE time on Monday

    • If the level falls below 20% before the next Monday, a refill takes place before that Monday

  • The team takes the following measurements and logs them in the Excel sheet:

    • the helium level at the dewar

    • the ATL level (L Volume on the display)

    • the output pressure of the AT recovery compressor

    • the ATP input and output pressures

    • the cylinder levels

    • the gas counting meter at the back of the helium room

    • the chilled water temperature (there are two thermostats)

  • Every 3 months, the water filter is replaced

  • Everyone wears cryogenic gloves during the maintenance intervention

Helium refill: notes from the lab

The notes below were taken while observing a refill from the ATL; the formal procedure is given in the next section. Filling from an external helium dewar provided by a supplier follows a slightly different procedure.

  1. Shut down the ATL system from its touch screen: Mode, then Stop. After 10 seconds it stops, and the ATL compressor is off as well

  2. Remove the right and left pipes from the back of the ATL, as well as the electric power plug and the gas pipe (4 connections in total)

  3. Move the red ATL cylinder to the back of the dewar

  4. Take the needle (transfer line). When the needle is put into the ATL cylinder, a flash, a little noise and some fog occur

  5. Check the T diode value on the ATL (a built-in battery keeps the display of the ATL powered on). If it is above 3, some helium must first be evacuated using the second valve. When it is below 3, proceed with the needle

  6. Before refilling, turn the Apollo handle 90 degrees counter-clockwise, to the transfer position

  7. If the pressure is high, some gas is released at this point from the valve near the Apollo handle. When the pressure is very high, the valve can be partially closed for a few minutes to avoid a strong evacuation of the high pressure. Once the pressure is gone, open the valve fully again (red handle pointing south)

  8. Remove the cap at the back of the dewar

  9. Insert the short end of the needle into the port of the dewar from which the cap was removed, then tighten it

  10. Put the ATL in transfer mode

  11. Press the green square Start button on the Automatic Helium Supplier device

  12. Wait a few minutes: the level shown on the Automatic Helium Supplier should start increasing. During this time, the liquid helium is transferred to the dewar, while the vapor is channelled through the tubes back to the 4 cylinders

  13. When the 4 cylinders are full (the gauge pressure shows 70; unit to be checked), the light turns red. If more liquid helium is needed while the cylinders are full, some vapor must be released using the black handle above the KIT racks; keep it open until the filling is finished

  14. The filling stops when either the cylinders are full or the helium level has reached 90-95%. The filling should also be stopped if the ATL is below 20 litres

  15. To stop the filling, set the ATL to stop the transfer, then press “Stop” (the red square button) on the Automatic Helium Supplier

  16. Disconnect the needle from the dewar side and from the ATL side, and put it back in its place

  17. Move the ATL system back to the helium chamber and connect it again. Before restarting the ATL, put the yellow handle back to BPC

  18. Turn the ATL on, in liquefaction mode

  19. Make sure that the black handle above the rack is properly closed and that the cap at the back of the dewar is back in place

  20. Update the Excel sheet with the new helium values

Helium refill: step-by-step procedure

  1. Before the helium refill, record the following data in the logbook:

    • amount of liquid helium in the MEG, in %

    • gas counter

    • medium pressure (MP) hub screen: outlet P

    • ATP screen: volume of purified gas, pressure (P) input, P output

    • ATL screen: L volume

  2. Stop the ATL by pressing MODE → STOP → OK

  3. Disconnect the gas inlet, supply, return and electrical connector from the rear side of the ATL. Release the wheel brake if necessary

  4. Switch the yellow valve handle to the TRANSFER position (horizontal)

  5. Move the ATL to the MEG room

  6. Press the green START button on the MEG level meter

  7. Put on protective face shields and adequate cryo-gloves

  8. Release and remove the plug from the transfer port, and carefully insert the transfer line into the port. Do not bend the transfer line! It must remain vertical at all times. Stop inserting when the thick portion of the transfer line passes through the sealing washer, then tighten the washer

  9. Slowly lower the transfer line until a white plume comes out of the other side

  10. Insert this side into the MEG inlet port, and seal the port by tightening the washer if necessary

  11. Slowly lower the transfer line into the ATL until it touches the bottom, then pull it back by 3-5 cm

  12. Start the refill by pressing MODE → TRANSFER → 5. Press CANCEL if compressor activation is requested. Touch the screen again to return to the main menu

  13. Observe the change of the helium level in the ATL (decreasing) and in the MEG (increasing)

  14. Terminate the refill when one or more of the following conditions are fulfilled:

    • the ATL helium level is below 10 L

    • the MEG helium level is above 90%

    • the red overfill light on the wall is activated

  15. Lift the transfer line by 60-70 cm. Wait approximately 30 seconds and unplug the line from the MEG port. Then quickly remove the transfer line from the ATL

  16. Press the red STOP button on the MEG level meter and the green POWER button on the wall box of the MEG

  17. Move the ATL back into the soundproof enclosure and activate the wheel brake

  18. Switch the yellow valve handle to the BPC position (vertical)

  19. Connect the gas inlet, supply, return and electrical connector at the rear side of the ATL

  20. Start the ATL by pressing MODE → LIQUEFY → SLOW

  21. Record in the logbook the same data as in the first step. The procedure is then complete

Important

If the difference between P input and P output on the ATP screen is 4 PSI or higher, make sure that the medium pressure (MP) hub outlet pressure is below 5 bar, then start the ATP regeneration by pressing MODE → REGENERATION → LOW TEMPERATURE REGENERATION → OK.

Contacts table

Name

Email

Number

Role

Hadi Zaatiti

hz3752@nyu.edu

+971 56 275 4921

Research Scientist

Lawrence Torres

ljt7767@nyu.edu

NA

NA

Qiang Zhang

qz19@nyu.edu

NA

NA

QD Helium Recovery

heliumrecovery@qd-europe.com

NA

NA

QD Konstantin Voigt

voigt@qd-europe.com

NA

NA

QD Tobias Adler

adler@qd-europe.com

NA

NA

Ahmed Ansari

aa7703@nyu.edu

NA

Helium store manager (Primary contact for getting Helium tanks)

Mohammad Rakib

mr5527@nyu.edu

NA

Logistics and Sanitation Coordinator